Industrial BESS · Pune · India

Your peak-tariff bill is a cost choice.

For HT industrial units in Maharashtra, a properly sized Battery Energy Storage System can shave demand charges, erase peak-window penalties, and turn your solar plant into a true 24-hour asset — saving a typical facility around ₹11 lakh a year, without touching production.

Commissioned at WMI Bhandgaon HT & LT C&I EMS-Driven Dispatch
Microgrid · Live Telemetry LIVE
Solar PV
+380 kW
BESS · 1.2 MWh
220 kW
Grid
0 kW
DG Set
Standby
Saved this cycle
94.2L
vs baseline
grid-only
consumption
1.2MWh
Largest Install
600kW
Peak Output
₹11L / yr
Typical HT Savings
5ms
Grid Switchover
Why Storage Now

The economics changed. Most CFOs haven't caught up yet.

MERC's tariff structure is becoming more cost-reflective through FY 2030. Demand charges keep rising. Peak-window penalties keep growing. Storage is no longer a green premium — it's a margin-defense tool.

01

Peak Shaving

Discharge stored energy during peak-tariff windows. Your meter never sees the spike. Demand charges drop where they matter most.

02

Solar Capture

Capture daytime solar that would otherwise export at low feed-in tariffs. Deploy it during evening operations or peak rate windows.

03

Diesel Avoidance

Replace DG run-hours during outages. 5ms changeover protects critical loads. Lower fuel bills, lower noise, lower emissions.

04

Power Quality

Stabilise voltage and frequency at the plant level. Protect motors, drives, and SCADA from grid sag and harmonics.

05

Demand Charge Relief

For HT consumers, demand charges can be 30–40% of the bill. Properly sized BESS reshapes your demand profile permanently.

06

Net Zero Pathway

Storage is the bridge between intermittent renewables and 24/7 operations. The only credible route to a low-carbon factory.

Commissioned · 2025

Western Metal Industries, Bhandgaon Plant

One of India's largest aluminium slug producers asked us a simple question: can we run a production line on solar after sunset?

We delivered a 600 kW / 1.2 MWh BESS integrated with their existing 500 kW solar plant, DG set, and grid supply — coordinated by an AI-driven Energy Management System that prioritises renewables first, storage second, grid third, DG only as last resort.

600 kW
BESS Power
1.2 MWh
Storage Capacity
500 kW
Solar PV Integration
4-source
Microgrid Architecture
Read the full case study
System Architecture · Bhandgaon
SOLAR PV 500 kW DG SET Backup BESS 1.2 MWh GRID 11 kV HT AI-DRIVEN EMS Energy Management priority dispatch PLANT LOAD Aluminium Slug Production
Is BESS Right For You?

If you tick three of these five boxes, we should talk.

We focus exclusively on commercial and industrial customers in India. We don't do residential, and we don't take on projects we can't deliver well.

Request a Quote
  • You're on HT industrial supply with a monthly bill above ₹10 lakh
  • Your facility already has solar PV (or is planning a rooftop installation)
  • You operate during peak-tariff windows or run multiple shifts
  • DG diesel consumption is meaningful or grid outages disrupt production
  • You have committed Net Zero or RE100 targets to meet
Request a Quote

Tell us about your facility.

Share your bill data and a few details about your operation. We'll come back within one working day with an indicative system size, savings estimate, and payback period — no obligation, no sales pressure.

Direct Line
Office
Pune, Maharashtra
Quick Quote Request

Get an indicative proposal within 24 hours.

We respond within one working day. Your data stays with us.